产品·订单承诺

订单承诺

将真实订单转化为日程化的履约计划——按数量、供应来源、日期和可靠性划分的分批——以及需要发出的供应订单。预览、调整、确认。

Fulfilment plan · proposed

SO-48213 · 1 300 u · requested 21 Nov

On time
Likely 18 Nov range 16–21 Nov

600 u confirmed · 400 u scheduled · 300 u estimated

Tranche Source Date Reliability
T1 · 600 uLyon DC, on hand2026-11-13Confirmed
T2 · 400 uRotterdam, PO-77312026-11-16Scheduled
T3 · 300 uBrno supplier, lead-time stats2026-11-18 (16–21)Estimated

Supply order to emit

PO · 300 u · Brno · order by 2026-11-04

Fictional order, for illustration.

Adjust Commit plan

可靠性

三个等级,无需依赖颜色即可识别。

每个分批都带有一个等级。图案、形状和文字传达同样的信息,因此计划在灰度打印下,以及对任何色觉类型,都能被正确读取。

Confirmed

On hand, or a date the supplier has confirmed.

Scheduled

A planned receipt with a date, not yet confirmed.

Estimated

Derived from lead-time statistics, shown with its range.

来源

每个日期都会显示其父记录。

可能的日期由现有库存、未结清的采购订单以及供应商提前期统计数据推算得出。计划员在确认之前,可以查看每个来源及其贡献程度。

Lineage

Why 18 Nov

ERP stock snapshot, 06:00 UTC PO-7731, Rotterdam Lead-time stats, Brno 600 u on hand 400 u ETA 16 Nov 9–12 d lead time, P10–P90 18 Nov likely · range 16–21 Nov
Select any figure in Provisor to see its sources. Fictional data.

比较

在同一基准上并排呈现选项。

选项B提前2天发货,费用多€310。由您来选择。

Option Likely date Range Reliability mix Extra cost Status
A · Lyon, Rotterdam, Brno 2026-11-18 16–21 Nov 600 C · 400 S · 300 E €0 On time
B · Lyon, expedite Rotterdam 2026-11-16 15–17 Nov 600 C · 700 S +€310 On time
C · Lyon only 2026-11-13 13 Nov 600 C €0 Short 700 u

C = confirmed, S = scheduled, E = estimated. Fictional order SO-48213, 1 300 u requested for 21 Nov.

运作方式

预览、调整、确认。

当订单被录入或变更时,Provisor会提出一份计划。计划员调整供应来源、日期或数量后予以确认。此后Provisor才会在贵组织中以草稿形式发出供应订单。

Provisor如何映射到贵组织

Confidence band

Projected stock on hand, next 12 weeks

SKU 40-118 · Lyon DC
1 500 1 000 500 0 u Reorder point 820 u Safety stock 210 u 1 300 u Today W3 W6 W9 W12 P90 P50 P10
Median with P10–P90 range. The range widens as lead-time variance accumulates. Derived from 26 weeks of demand and 14 supplier receipts.

做出可兑现的订单承诺。

预约演示